Roee Kalinsky's RV-7A Project

Cockpit Floors and Covers
Home Up News Specifications

 

Back Up Next

Cockpit Floors and Covers

Running Total Hours: 0.0

 

2006.01.28: (6.0) Rather than riveting the baggage floors in place, I decided to make them removable.  This will give me relatively easy access for inspection and maintenance, and will allow me to install equipment underneath, such as a strobe power supply or autopilot controller.  While this is a fairly common modification among RV builders, there are different possibilities of how to do it.  Since I do consider the baggage floors "structural", (they box in that part of the fuselage, and therefore add rigidity), my philosophy was to make my modification no less strong than the original.  While this is certainly overkill, I decided to replace each rivet with an 8-32 screw.  Now I'll get to work.  Lots of nut plates to install.

2006.01.29: (4.0) Working on the right side baggage floor.  Installing nut plates...

2006.02.03: (3.0) When I drilled out and removed the left side baggage floor I found a surprise.  A large countersink bit in one of the bays, left behind apparently by the QB factory in the Philippines.  That validates my idea of checking EVERYTHING.  The only other area I haven't checked thus far is the attachment structure between the fuel tanks to the wing spars, which would require removing the tanks.  I'm now reconsidering ... maybe that would be a worthwhile exercise.

2006.02.04: (1.0) Ran out of nut plates.  Time to call Van's.

2006.02.15: (0.0) Received my order from Van's with more nut plates and a few other items.  Note for next time: although Van's is a little cheaper than Spruce for hardware, they take a few days to ship an order.  Also, UPS ground takes a week from Van's, whereas it's next day from Spruce.

2006.02.22: (0.5) Finished pop-riveting on the right side seat floor.

2006.02.23: (0.5) Finished pop-riveting on the left side seat floor.

2006.02.26: (2.0) Installing nut plates for the left baggage floor....

2006.03.04: (3.0) Installing nut plates for the left baggage floor, including two "custom made" nut plates for the joint between the floor ribs and the bulkhead.  (See description of similar custom nut plate I made: Flaps Actuator 2006.03.04)

2006.03.18: (1.5) Started fabricating the Z-brackets for the tunnel cover.  For the first attempt, "measure twice cut once" wasn't enough.  I measured twice, very precisely, the same wrong measurement both times.  Fabricated another bracket, correct this time.  But I need to order more Z channel from Van's.  I also found that the plate Van's sent me was labeled with the correct dimensions, but in fact was about 1/2" short.  I'll just order another one too.

2006.04.22: (1.0) At the end of an AKZO spraying session I had some left, so I edge-finished and sprayed AKZO on the F-704K upright cap strips.

2006.??.??: (0.0) Fabricated the other Z bracket for the tunnel cover.

2006.05.20: (3.0) Made the top plate for the control rod tunnel cover.  I found that the part Van's supplied was slightly too small, and the stock design also left an unsightly gap between the aft end of the tunnel cover and the framework for the flaps.  I fabricated my own plate from larger stock and also added a tab at the aft end to make a nicer interface.  Fitted and drilled everything...

2006.05.23: (2.0) Since I'm planning on a fuel-injected engine, I'll need a high-pressure (25 psi) auxiliary fuel pump, rather than the standard low-pressure pump used for carbureted engines.  I'm using Van's kit "7/7A F.I. PUMP INSTAL" (see section Fuel System).  Unlike the standard low-pressure pump which mounts on the firewall, the high-pressure pump mounts on the cockpit floor under the fuel selector.  This requires modifications to the structure in the area of the fuel selector.

Started deburring parts...

2006.05.24: (2.0) More deburring...

2006.05.26: (2.5) Working on the structure around the fuel selector and fuel pump: measuring, marking, test fitting... no "real work".

2006.05.31: (2.0) Drilled #40 guide holes in the floor stringers.  Used a piece of angle as a drill guide to set a hole height of 0.420".  Then clamped in the F-7115A fuel pump base plate (a.k.a. "bottom cover") and match-drilled it.

2006.06.01: (1.0) Started modifying the F-782C bottom cover for the high-pressure pump installation.  Shortened it to clear the F-7115A.

2006.06.02: (1.0) Continued modifying the F-782C bottom cover for the high-pressure pump installation.  Made the cutout on the aft end.

2006.06.03: (5.0) Clamped the F-782C bottom cover to the floor stringers and match-drilled.

Fitted and drilled the fuel pump cover assembly.

2006.06.04: (3.0) Prepped, modified, fitted, and drilled the fuel selector cover.

2006.06.06: (2.5) Prepped the cabin heat baffle and match-drilled the to the F-782C bottom cover.  Bent out the louvers on the bottom cover.

2006.06.xx: (6.0) [this entry covers several days] Finished deburring everything, including the cabin heat louvers which were a royal PITA.

2006.06.18: (3.0) Finished fitting all the cover pieces.  Started drilling and countersinking for nut plates. 

2006.06.24: (2.5) Finished countersinking, and tied up a few other loose ends on the fwd center covers.

2006.06.30: (2.5) Prepped all the front covers for primer.

2006.07.01: (2.0) Sprayed AKZO primer on the front covers.

2006.07.02: (2.0) Started riveting the cover assemblies.

 

Back Up Next

 

 

Send mail to roee@kalinskyconsulting.com with questions or comments about this web site.
Copyright © 2003 Roee Kalinsky
Last modified: July 31, 2006

Visit my consulting web site at www.kalinskyconsulting.com for your engineering needs.